FLOWLINE 2
Reliable, accurate and efficient, the Elecro FlowLine 2 fully titanium heater is the ideal choice for in-ground pools, above-ground pools and spas.
Features & Benefits
- Nine power options ranging from 2-kW to 24-kW
- Non-wired, requires connection to external contactor
- Robust, durable construction
- Ultra-reliable flow switch allows safe operation
- Fitted with temperature thermostat and overheating sensor
- Compact, durable design
- Analogue control with 1.2°C differential
- Titanium flow tube and titanium heating element(s)
- Can be floor or vertically wall mounted
- Vortex, long life, stay clean heating element technology
- 100% efficiency throughout product life
- Silent operation
| Brand |
elecro |
|---|

